Foundational Confidence: 100% ·Mar 10, 2026

Laniakea Implementation Roadmap

Status: Draft Last Updated: 2026-02-12


Overview

This roadmap outlines the phased implementation of Laniakea infrastructure, from Phase 0 legacy exceptions through full autonomous operation with Sentinel formations in Phase 10.

Phase 0 handles exceptional deployments (primarily Grove) that must proceed before standardized infrastructure exists. The main progression follows a deliberate sequence: establish foundational infrastructure first (Phases 1-4), then build factory systems for scalable deployment (Phases 5-8), and finally achieve full automation through Sentinel formations (Phases 9-10).


Phase Summary

Phase Name Core Deliverable
0 Legacy & Exceptional Deployments Grove pre-standardization deployments; acknowledged technical debt. 6 substages (0.0–0.5).
1 Pragmatic Delivery MVP beacons (lpla-verify), Configurator, NFAT infrastructure; manual settlement continues. 7 substages (1.0–1.6).
2 Monthly Settlement Full lpla-checker with settlement tracking; formalized monthly settlement cycle
3 Daily Settlement Transition from monthly to daily settlement cycle
4 LCTS Launch srUSDS and first Portfolio Halo (pre-auction); Core Council manages srUSDS rate
5 Halo Factory Automated Halo Agent creation with LCTS/NFAT class attachment
6 Generator PAU Single-ilk USDS Generator PAU replacing per-Prime ilks
7 Prime Factory Automated Prime deployment
8 Generator Factory Automated Generator deployment
9 Sentinel Base & Warden High-power beacon foundations, Warden formation, auction activation
10 Sentinel Stream Stream formation for continuous operations

Detailed Phase Descriptions

Phase 0: Legacy & Exceptional Deployments

Objective: Deploy legacy and exceptional actions for Grove before standardized Laniakea infrastructure is ready

Scope: Grove (Star Prime) only. All Phase 0 deployments are acknowledged technical debt — they operate outside standardized infrastructure and will be converted to Core Halos (or evolved into proper Halo Classes) as Phase 1 matures.

Substages:

Substage Name Description
0.0 Planning & Finalization Inventory all legacy/exception actions; accept technical debt
0.1 Custodial Crypto-Backed Lending USDC → legal entity → offchain custodial crypto-backed lending
0.2 Crypto-Enabled Lending USDC → legal entity → crypto-enabled lending
0.3 Tokenized RWA Trading Early-stage tokenized RWA trading (precursor to PSM3-based Halo Class)
0.4 Blockchain Bridge Bridge to a new blockchain
0.5 Star4 Deployment Initial deployment only; joins standard Phase 1 track afterward

Runs concurrently with Phase 1. Phase 0 does not block Phase 1 progress.

End State: All planned Grove exceptional deployments live. Phase 1.3 has a clear inventory of assets to wrap as Core Halos.

Document: phase-0-legacy-exceptions.md


Phase 1: Pragmatic Delivery

Objective: Establish minimal viable infrastructure for automated capital deployment

Settlement: Existing manual process continues (formalized monthly settlement begins in Phase 2)

Substages:

Substage Name Key Outcome
1.0 Planning Stakeholder alignment, Prime cohort identification
1.1 Diamond PAU Deployment Diamond PAUs deployed for first-cohort Primes
1.2 Operational Infrastructure Synome-MVP, lpla-verify, lpha-relay, lpha-attest operational
1.3 Legacy Cleanup & Core Halos Legacy assets standardized or wound down
1.4 Configurator Deployment Spell-less Prime operations enabled
1.5 First Term Halo Halo1 live with end-to-end NFAT flow validated
1.6 Term Halo Cohort Halo2-Halo6 deployed and accepting NFAT deployments

lpla-verify: Monitors positions, calculates CRRs, generates alerts. Does not track settlement — that capability arrives with lpla-checker in Phase 2.

End State: Primes can deploy into Core Halos and Term Halos without spells. Full first-cohort of Term Halos operational. Five beacons live (lpla-verify, lpha-relay, lpha-nfat, lpha-attest, lpha-council).

Document: phase-1-overview.md


Phase 2: Monthly Settlement

Objective: Formalize monthly settlement cycle with beacon-assisted oversight

Settlement Cycle: Monthly (formalized with lpla-checker tracking)

Key Deliverables:

  • lpla-checker beacon — Extends lpla-verify with settlement tracking, completeness verification, late payment detection, and penalty calculation
  • Formalized monthly settlement — Canonical monthly timeline with defined settlement windows
  • Prepayment and penalty mechanics — Prime interest prepayment obligations, penalty calculation and logging
  • Synome schema updates — Monthly epoch identifiers, settlement artifacts, penalty events

Dependencies: Phase 1 complete

End State: Monthly settlement runs reliably with lpla-checker validation. Prepayment and penalty system operational. Settlement artifacts consistently logged in Synome.

Document: phase-2-monthly-settlement.md


Phase 3: Daily Settlement

Objective: Transition from monthly to daily settlement cycle

Settlement Cycle: Daily (21h Active Window + ≤3h Processing Window)

Daily Timeline (UTC):

Period Timing Purpose
Active Window 16:00 → 13:00 Data collection, deposits/withdrawals
Processing Window (Lock) 13:00 → 16:00 Calculation, verification, prepayment
Moment of Settlement 16:00 New parameters take effect

Key Deliverables:

  • Daily settlement infrastructure — Lock/unlock cycle synchronized across all systems
  • Interest/distribution prepayment system — Primes prepay before 16:00 or face penalties
  • Synome schema updates — Daily reporting, penalty tracking
  • Beacon modifications — lpla-checker adapted for daily cadence
  • Late payment penalties — Continuous accrual from Moment of Settlement until payment

Dependencies: Phase 2 complete (formalized monthly settlement established)

End State: All Primes and Halos operate on daily settlement cycle. Prepayment and penalty system operational at daily cadence. Allocation remains governance-directed until stl-base enables auctions.

Document: phase-3-daily-settlement.md


Phase 4: LCTS Launch

Objective: Launch LCTS (Liquidity Constrained Token Standard) with srUSDS and MMF Portfolio Halo

LCTS Core Concept: Queue-based system for capacity-constrained token conversions. Users subscribe assets, receive shares representing queue position, receive converted assets over time as capacity allows.

LCTS Architecture:

  • SubscribeQueue + RedeemQueue — Independent queues with generation model
  • Generation lifecycle: DORMANT → ACTIVE → LOCKED → (ACTIVE or FINALIZED → DORMANT)
  • Lock window: 13:00-16:00 UTC (synchronized with daily settlement)
  • LCTS-pBEAM — Operated by lpha-lcts beacon (LPHA, not sentinel)

srUSDS Rate Management (Pre-Auction): When srUSDS goes live, Sky Core will initially decide what rate it receives, manually targeting a governance-set rate. Core Council manages day-to-day rate decisions according to instructions from Atlas. This governance-directed approach remains in place until Phase 9 activates sealed-bid auctions.

Key Deliverables:

  • LCTS smart contracts — SubscribeQueue, RedeemQueue with generation model
  • srUSDS token — Senior Risk Capital token via LCTS (Generator level)
    • sUSDS → srUSDS via SubscribeQueue
    • srUSDS → sUSDS via RedeemQueue
    • Exchange rate updated at each settlement
  • Holding System — Contract backing srUSDS with sUSDS, receives funding from Prime PAUs
  • lpha-lcts beacon — Manages LCTS vault operations (lock, settle, capacity determination)
  • Pre-auction origination mode — Core Council sets srUSDS rate and capacity directly (no auctions until stl-base)
  • MMF Portfolio Halo — First LCTS-based Halo for Money Market Fund deployment
  • Target spread mechanism — Governance-set spread above SSR protects yield rates
  • Net flow netting — Subscribe/redeem queues cancel out first, reducing conversion needs

LCTS Use Cases by Agent Type:

Agent Token Description
Generator srUSDS External pooled Senior Risk Capital
Prime TEJRC Tokenized External Junior Risk Capital
Prime TISRC Tokenized Isolated Senior Risk Capital
Halo Unit shares Claims on Halo Units (default for capacity-constrained products)

Portfolio Halo Structure:

  • Halo Class = shared PAU + lpha-lcts + legal framework
  • Multiple Halo Units per class (e.g., senior/junior tranches)
  • Manual deployment + onboarding via spells (factories begin in Phase 5)
  • Prime allocations into Units are governance-directed/manual (Prime-side stl-base automation begins in Phase 9)

Dependencies: Phase 3 complete (daily settlement cycle required — LCTS lock/settle synchronized with daily cycle)

End State: srUSDS operational as first LCTS product. MMF Portfolio Halo accepting deposits. Infrastructure ready for additional Portfolio Halos.

Document: phase-4-lcts-launch.md


Phase 5: Halo Factory

Objective: Enable automated creation of Halo Agents with attached Halo Classes via Laniakea Factory

Laniakea Factory Concept: Factory system deploys standardized PAU infrastructure from audited templates. Factory-deployed PAUs get streamlined governance approval.

Halo Class Structure: A Halo Class = grouping of Halo Units sharing:

  • PAU (Controller + ALMProxy + RateLimits)
  • Beacon (lpha-lcts or lpha-nfat)
  • Legal Framework (buybox, counterparty requirements, recourse)

Key Deliverables:

  • Halo Factory smart contracts — Deploy standardized Halo PAUs
  • Halo Class templates:
    • LCTS-based (Portfolio Halos): Pooled capital, fungible shares, queue-based settlement
    • NFAT-based (Term Halos): Bespoke deals, ERC-721 NFATs, individual queues
  • Factory → Configurator integration:
    • Auto-register PAU contracts
    • Pre-create init rate limits for standard operations
    • Streamlined cBEAM grants for GovOps
  • Halo Unit deployment within Classes:
    • Multiple Units per Class (e.g., senior/junior tranches)
    • Units vary: seniority, yield, capacity, specific terms
    • Shared beacon and legal infrastructure

NFAT Facility Structure (Term Halos):

  • Each Facility is a Halo Class with its own buybox
  • Individual queues per Prime (not shared generations)
  • Halo claims from queues, mints ERC-721 NFAT
  • Each NFAT = claim on one Halo Unit (bankruptcy remote)
  • Deal terms tracked in Synome (APY, duration, maturity)

Dependencies: Phase 4 complete (LCTS and daily settlement established; factories begin here)

End State: New Halos deployed via factory with standardized PAU infrastructure. Both LCTS and NFAT Halo Classes supported. No custom contract development required.

Document: phase-5-halo-factory.md


Phase 6: Generator PAU

Objective: Replace individual Prime ilks with unified USDS Generator PAU architecture

Generator Layer Role (from Architecture):

  • Manages interface with stablecoin ERC20 contract
  • Deploys capital into Prime Layer via ERC4626 vaults
  • Has its own governance scope separate from Prime/Halo
  • Issues srUSDS (Senior Risk Capital) via LCTS

Key Deliverables:

  • Generator PAU smart contracts — Standard PAU pattern (Controller + ALMProxy + RateLimits)
  • Single MCD ilk architecture — Replace per-Prime ilks with single Generator ilk
  • ERC4626 vault interface — Primes deposit/withdraw from Generator vault
  • srUSDS issuance integration — Generator manages Senior Risk Capital via LCTS
  • Generator Configurator scope — Separate governance scope for Generator operations
  • Migration path — Existing Prime ilks migrate to Generator PAU

Architecture Change:

Before (per-Prime ilks):          After (Generator PAU):

Prime1 ── ilk1 ── MCD             Prime1 ─┐
Prime2 ── ilk2 ── MCD       →     Prime2 ─┼─ [ERC4626] ─ Generator PAU ─ ilk ─ MCD
Prime3 ── ilk3 ── MCD             Prime3 ─┘
                                     │
                                     └── srUSDS (via LCTS)

Generator → Prime Connection:

  • ERC4626 vault (deposit anytime, redeem if liquidity available)
  • Rate limits on deposit/withdraw
  • Each Prime controls its own vault's liquidity availability

Dependencies: Phase 5 complete (Halo Factory establishes factory patterns)

End State: Generator PAU operational with single MCD ilk. All Primes connect via ERC4626 vault. srUSDS issuance integrated.

Document: phase-6-generator-pau.md


Phase 7: Prime Factory

Objective: Enable automated Prime deployment via Laniakea Factory

Prime Layer Role (from Architecture):

  • Receives capital from Generator via ERC4626 vault
  • Deploys to: Halo Layer, Core Halos (legacy DeFi), Foreign Primes (cross-chain)
  • Each Prime controls its own vault's liquidity availability

Key Deliverables:

  • Prime Factory smart contracts — Deploy standardized Prime PAUs
  • Automated Diamond PAU deployment — EIP-2535 faceted architecture
    • Standard facets: ERC4626Facet, SwapFacet, NFATFacet, AdminFacet, etc.
    • New integrations = new facets, not controller upgrades
  • Automatic Generator PAU integration:
    • ERC4626 vault connection
    • Rate limits on Generator deposits/withdrawals
  • Automatic Configurator registration:
    • PAU registered via BEAMTimeLock (14-day delay)
    • Init rate limits pre-created for standard targets
    • cBEAM grant path for GovOps
  • Prime → Halo connection templates:
    • LCTS-based Halo vaults
    • NFAT Facility queues
    • Core Halo interfaces (Morpho, Aave, SparkLend)
  • Risk capital integration:
    • TEJRC (Tokenized External Junior Risk Capital) via LCTS
    • TISRC (Tokenized Isolated Senior Risk Capital) via LCTS

Factory → Configurator Flow:

  1. Factory deploys Prime PAU (Diamond Proxy + facets + ALMProxy + RateLimits)
  2. Factory registers PAU in Configurator (via BEAMTimeLock)
  3. Factory pre-creates init rate limits for standard operations
  4. Core Council grants cBEAM to GovOps (14-day timelock)
  5. GovOps activates rate limits, sets relayer, begins operations

Dependencies: Phase 6 complete (Generator PAU required for Prime connection)

End State: New Primes deployed via factory with standardized Diamond PAU. Automatic Generator integration. Streamlined Configurator onboarding.

Document: phase-7-prime-factory.md


Phase 8: Generator Factory

Objective: Enable automated Generator deployment for multi-Generator architecture

Why Multiple Generators:

  • Different stablecoin types (USDS, others)
  • Different risk capital structures
  • Different governance scopes
  • Isolation between Generator contexts

Key Deliverables:

  • Generator Factory smart contracts — Deploy standardized Generator PAUs
  • Multi-Generator architecture:
    • Each Generator has its own MCD ilk
    • Separate LCTS for each Generator's risk capital tokens
    • Independent governance scopes
  • Generator-to-Prime relationship management:
    • Which Primes can connect to which Generators
    • ERC4626 vault deployment for each relationship
    • Cross-Generator restrictions (if any)
  • Factory → Configurator integration:
    • Generator PAU registration
    • Generator-scope Configurator Unit deployment
    • Init rate limits for Generator operations
  • Risk capital token factories:
    • srUSDS deployment per Generator
    • Holding System deployment
    • LCTS queue deployment (SubscribeQueue + RedeemQueue)

Full Factory Stack:

Generator Factory
    │
    └── Generator PAU + srUSDS + Holding System
            │
            └── Prime Factory
                    │
                    └── Prime PAU (Diamond) + TEJRC/TISRC
                            │
                            └── Halo Factory
                                    │
                                    └── Halo PAU + Halo Class (LCTS or NFAT)

Dependencies: Phase 7 complete (Prime Factory establishes middle layer patterns)

End State: Full factory stack operational. New Generators, Primes, and Halos deployable via standardized factories. No custom contract development at any layer.

Document: phase-8-generator-factory.md


Phase 9: Sentinel Base & Warden

Objective: Deploy Baseline Sentinel (stl-base) and Warden Sentinels (stl-warden) — the execution and safety layers of sentinel formations, enabling auctions

Sentinel Formation Architecture: Sentinels operate as coordinated formations (data plane / control plane / safety plane):

Component Role Execution Authority Operator
stl-base (Baseline) Primary decision-making and execution Yes — holds Execution Engine Accordant GovOps
stl-stream (Stream) Data ingestion, signal generation, intent streaming No — feeds Baseline only Ecosystem Actor
stl-warden (Warden) Independent monitoring, risk enforcement Limited — safety stops only Independent operators

Key Deliverables:

  • stl-base (Baseline Sentinel)
    • Holds Execution Engine (pBEAMs, signs transactions)
    • Runs public Base Strategy from Prime Artifact
    • Three parallel processes: Counterfactual Simulation, Streaming Monitor, Active Management
    • Fail-safe: reverts to Base Strategy if Stream disconnects
  • Auction activation (OSRC + Duration)
    • stl-base instances submit bids for srUSDS origination capacity and duration bucket capacity
    • lpha-auction switches from Core Council rate-setting to sealed-bid matching
    • lpha-lcts consumes auction results for srUSDS settlement capacity/yield inputs
  • stl-warden (Warden Sentinels)
    • Must be operated by independent parties (not same as Baseline)
    • Multiple wardens per formation (operator diversity)
    • Continuous monitoring, invariant enforcement, anomaly detection
    • Halt authority — can freeze Execution Engine
    • Determines Time to Shutdown (TTS) — bounds maximum damage from rogue sentinel
  • TTS Economics
    • Maximum Damage = Rate Limit × TTS
    • Required Risk Capital ≥ Rate Limit × TTS
    • Better wardens → Lower TTS → Higher rate limits / less risk capital required
  • Sentinel Toolkit — lpla-checker (verification/settlement), stk-carry (performance attribution)
  • Synome integration — Counterfactual simulation logging, warden attestations, formation status

Why Separation Matters:

  • Baseline: All execution flows through public, auditable code
  • Wardens: Independent safety oversight, cannot be compromised by same failure modes

Dependencies: Phase 8 complete (full factory stack provides scale for Sentinel operations)

End State: Baseline Sentinels execute Prime strategies. OSRC and duration auctions are live (stl-base bidding). Multiple independent Wardens monitor each formation. TTS-based risk capital requirements operational.

Document: phase-9-sentinel-base-warden.md


Phase 10: Sentinel Stream

Objective: Deploy Stream Sentinels (stl-stream) for proprietary intelligence and alpha generation

Stream Sentinel Role: The commercial engine for alpha generation — allows proprietary intelligence to influence execution without exposing strategies or holding keys.

Key Deliverables:

  • stl-stream (Stream Sentinel)
    • Operated by Ecosystem Actors (DevCos, Trading Firms)
    • Private/proprietary — strategies not exposed
    • Data ingestion (public + proprietary sources)
    • Signal generation and model inference
    • Intent streaming — sends trading intent (not transactions) to Baseline
    • No Execution Engine — cannot move capital directly
  • Streaming Accord — Smart contract framework governing Baseline ↔ Stream relationship
    • Risk Tolerance Interval — bounds on acceptable intent (position limits, velocity limits, concentration limits)
    • Performance Fee Ratio — share of alpha that becomes carry
    • Termination conditions, dispute resolution
  • Carry Mechanism
    • Carry = (Actual PnL - Simulated Baseline PnL) × Performance Fee Ratio
    • Stream only profits when outperforming Base Strategy
    • Counterfactual simulation (stl-base Process A) provides benchmark
  • The Compounding Loop
    Public Capital → Private Intelligence → Better Streams → More Carry → More Intelligence
    
    • Carry reinvested into AGI capabilities (compute, models, data)
    • Fastest known compounding loop, bounded by synomic constraints

Formation Lifecycle:

  1. Accord Negotiation (Risk Tolerance, Performance Fee)
  2. Formation Assembly (Baseline, Stream, Wardens register in Synome)
  3. Activation (Stream sends intent, Baseline executes or falls back)
  4. Ongoing Operation (continuous trading, periodic settlement, carry distribution)
  5. Termination (expiration, breach, governance intervention)

Safety Properties:

  • All execution flows through public Baseline code
  • Wardens provide independent halt authority
  • Rate limits bound maximum damage
  • Beacons can be revoked by governance
  • Worst-case losses collateralized by risk capital

Dependencies: Phase 9 complete (Baseline + Wardens must be operational before Stream can influence execution)

End State: Full sentinel formations operational (stl-base + stl-stream + stl-warden). Ecosystem actors operate Streams, earning carry from alpha. Teleonomes compound intelligence within safe bounds.

Document: phase-10-sentinel-stream.md


Unscheduled Specifications

The following features have complete or partial specifications but are not yet assigned to roadmap phases:

Feature Specification Key Dependencies
Fixed Rates / Yield Splitter smart-contracts/fixed-rates.md LCTS exchange rate interfaces (Phase 4+), Exchange Halos
Exchange Halos Whitepaper Part 7 (no smart-contract spec) Limit orderbook infrastructure
Identity Networks Whitepaper Part 7 (no spec)
Sky Intents trading/sky-intents.md Sentinel formations (Phase 9+), Exchange Halos
SBE BEAM accounting/current-accounting.md Daily settlement cycle (Phase 3+) — governance-controlled execution surface for dynamic Smart Burn Engine
Folio Agents sky-agents/folio-agents/agent-type-folios.md Folio Agent deployment (stl-principal, automated folios, Growth Staking integration). Depends on: Halo Factory (Phase 5)
Growth Staking growth-staking/growth-staking.md Growth Staking mechanism linking staking rewards to growth asset holdings via folios. Depends on: Folio Agents
Trading Halos / lpha-amm Whitepaper Part 7, sky-agents/halo-agents/trading-halo.md Trading Halo type and lpha-amm beacon for automated market making. Depends on: Halo Factory (Phase 5)
SpellGuard Governance Transition governance-transition/spellguard-system.md Transition from Executive Vote to SpellGuard model (SpellCore + Guardians). See governance-transition/
Recovery Agents sky-agents/recovery-agents/agent-type-recovery.md Recovery Agent deployment for crisis response and system restoration. Prerequisite for full Sentinel formation autonomy (Phase 9+)

These features will be assigned to phases as their dependencies mature and implementation priorities are established.


Infrastructure Progression

Phase 0: Exceptions (concurrent with Phase 1)
├── Grove legacy deployments (0.1–0.4)
├── Star4 bootstrap (0.5, then joins Phase 1 track)
└── All become Core Halos in Phase 1.3 (or evolve into Halo Classes)

Phase 1-4: Foundation
├── Beacons: lpla-verify, lpha-relay, lpha-nfat, lpha-attest, lpha-council (Phase 1) → lpla-checker (Phase 2+)
├── Settlement: Manual → Formalized Monthly → Daily
├── Halos: Core Halos (wrapping Phase 0 debt) → Term Halos → Portfolio Halos (LCTS)
├── srUSDS: Core Council manages rate (pre-auction)
└── Beacons: LPLA/LPHA (low-power programs)

Phase 5-8: Factories
├── Halo Factory (LCTS + NFAT classes)
├── Generator PAU (unified ilk architecture)
├── Prime Factory
└── Generator Factory

Phase 9-10: Automation
├── Sentinel Base + Warden (execution + safety)
├── Auctions (OSRC + Duration) via stl-base
└── Stream formation (proprietary intelligence)

Dependencies Graph

Phase 0 (Legacy & Exceptional Deployments)  ──── runs concurrently ────┐
                                                                        │
Phase 1 (Pragmatic Delivery)  ◄─── Phase 0 assets feed into 1.3 ──────┘
    │
    ▼
Phase 2 (Monthly Settlement)
    │
    ▼
Phase 3 (Daily Settlement)
    │
    ▼
Phase 4 (LCTS Launch)
    │
    ▼
Phase 5 (Halo Factory)
    │
    ▼
Phase 6 (Generator PAU)
    │
    ▼
Phase 7 (Prime Factory)
    │
    ▼
Phase 8 (Generator Factory)
    │
    ▼
Phase 9 (Sentinel Base & Warden)
    │
    ▼
Phase 10 (Sentinel Stream)

Key Milestones

Milestone Phase Significance
Grove exceptional deployments live 0.1–0.4 Legacy deployments operational (acknowledged technical debt)
Star4 deployed 0.5 Star4 bootstrapped; joins standard Phase 1 track
Diamond PAUs deployed 1.1 EIP-2535 architecture live for first-cohort Primes
Synome-MVP + lpla-verify operational 1.2 Position monitoring and CRR verification live
Core Halos standardized 1.3 Legacy assets wrapped or wound down
First spell-less Prime deployment 1.4 Configurator enables operations without spells
First Term Halo (Halo1) live 1.5 End-to-end NFAT flow validated
Full first cohort (Halo1-Halo6) 1.6 Term Halo rollout complete
lpla-checker with settlement tracking 2 Formalized monthly settlement with beacon oversight
Daily settlement live 3 Settlement frequency scales
srUSDS launch 4 First LCTS product; Core Council manages rate
First factory-deployed Halo 5 Halo creation scales
Generator PAU live 6 MCD integration simplified
First factory-deployed Prime 7 Prime creation scales
First factory-deployed Generator 8 Full factory stack operational
First auctions live 9 Market-based allocation begins
First Sentinel formation active 9 Prime automation begins
Full autonomous operations 10 Human oversight for exceptions only

Document Index


Source References

This roadmap draws from the following source documents:

Smart Contracts

Document Relevance
smart-contracts/architecture-overview.md Four-layer architecture, PAU pattern, Laniakea Factory
smart-contracts/lcts.md LCTS queue system, generation model, settlement integration
smart-contracts/nfats.md NFAT Facility structure, queue mechanics, deal lifecycle
smart-contracts/diamond-pau.md EIP-2535 faceted architecture
smart-contracts/configurator-unit.md aBEAM/cBEAM hierarchy, SORL, timelock mechanics
smart-contracts/rate-limit-attacks.md Rate limit attack models and mitigations
smart-contracts/fixed-rates.md Fixed-rate yield splitting (PT/YT), LCTS exchange rate interface

Trading & Halos

Document Relevance
trading/sentinel-network.md Sentinel formations, TTS economics, Streaming Accord
sky-agents/halo-agents/portfolio-halo.md LCTS-based Portfolio Halos, Halo Classes, lpha-lcts beacon
sky-agents/halo-agents/term-halo.md NFAT-based Term Halos, lpha-nfat beacon, buybox model

Synomics

Document Relevance
synomics/macrosynomics/beacon-framework.md Beacon taxonomy (LPLA/LPHA/HPLA/HPHA), naming conventions

Accounting

Document Relevance
accounting/daily-settlement-cycle.md Settlement timing, auctions, tug-of-war, LCTS integration
accounting/tugofwar.md Tug-of-war algorithm for duration capacity allocation
accounting/genesis-capital.md Genesis Capital, Aggregate Backstop Capital, insolvency defense hierarchy
accounting/risk-capital-ingression.md Ingression curves, quality multipliers — relevant from Phase 4
accounting/forecast-model.md Financial projections, TMF waterfall modeling

Whitepaper

Document Relevance
whitepaper/sky-whitepaper.md Architecture overview, risk framework, loss absorption waterfall
whitepaper/appendix-c-treasury-management-function.md TMF mechanics — backstop targets, revenue allocation

Beacon Taxonomy Quick Reference

Profile Power Authority Examples Phase
LPLA Low Low lpla-verify (Phase 1), lpla-checker (Phase 2+), lpla-report 1+
LPHA Low High lpha-relay, lpha-nfat, lpha-attest, lpha-council, lpha-lcts, lpha-auction 1-4
HPLA High Low hpla-trade (private capital trading)
HPHA High High stl-base, stl-stream, stl-warden 9-10

Sentinels are a distinguished HPHA subclass with continuous real-time control over Synomic Agents (Primes, Halos).


Glossary of Key Terms

Term Definition
PAU Parallelized Allocation Unit (Controller + ALMProxy + RateLimits)
LCTS Liquidity Constrained Token Standard (queue-based token conversion)
NFAT Non-Fungible Allocation Token (bespoke deal claim)
srUSDS Senior Risk Capital token (Generator-level, via LCTS)
OSRC Originated Senior Risk Capital (Core Council-originated initially; auction-allocated once stl-base is live)
Tug-of-war Algorithm for allocating duration capacity to existing reservations
Lindy Liability duration measurement based on USDS lot ages
cBEAM Configurator BEAM (operational role for GovOps)
aBEAM Admin BEAM (Core Council role, manages inits)
SORL Second-Order Rate Limit (25%/18h constraint on increases)
TTS Time to Shutdown (warden detection latency)
Halo Class Grouping of Halo Units sharing PAU, beacon, and legal framework
Buybox Acceptable parameter ranges for NFAT deals within a Facility